Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 55
ID 55: Road construction, roadway reduced to one lane, speed restrictions in force.
Between I-84 and Franklin Road (Meridian). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 40 MPH. From 10:00PM MDT to 5:00AM MDT on weekdays and Sundays. Until October 10.
ID 55: Road maintenance operations, roadway reduced to one lane, look out for flaggers, short delays.
Between Smith's Ferry Drive - High Valley Road and Round Valley Road (10 to 13 miles south of the Cascade area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. Until today at about 4:00PM MDT.
ID 55 in both directions: Bridge construction, roadway reduced to one lane, look out for flaggers, delays, width limit in effect.
Between Mather Road and Neal Street (McCall). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. There is a width limit in effect. Expect 10 - minute delays. Width limit 14'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 24.
ID 55: Road construction, roadway reduced to one lane, look out for flaggers, delays.
Between Good Creek Road (3 miles south of the New Meadows area) and US 95 (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Expect 15 - minute delays. From 7:00AM MDT to 6:00PM MDT daily. Until today at about 6:00PM MDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on ID 55
Map of Reports on ID 55 Between I-84 and Franklin Road (Meridian). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 40 MPH. From 10:00PM MDT to 5:00AM MDT on weekdays and Sundays. Until October 10. Between Smith's Ferry Drive - High Valley Road and Round Valley Road (10 to 13 miles south of the Cascade area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. Until today at about 4:00PM MDT. Between Good Creek Road (3 miles south of the New Meadows area) and US 95 (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Expect 15 - minute delays. From 7:00AM MDT to 6:00PM MDT daily. Until today at about 6:00PM MDT.
ID 55: Road construction, roadway reduced to one lane, speed restrictions in force.
ID 55: Road maintenance operations, roadway reduced to one lane, look out for flaggers, short delays.
ID 55 in both directions: Bridge construction, roadway reduced to one lane, look out for flaggers, delays, width limit in effect.
ID 55: Road construction, roadway reduced to one lane, look out for flaggers, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info