Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 95
US 95
Between Carr Road (6 miles north of the Weiser area) and Rainbow Road (10 miles south of the Riggins area). A seal coat treatment has been applied. Look out for loose gravel on the roadway. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. Expect delays. Speed limit 35 MPH. From 7:00AM MDT to 7:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until tomorrow at about 12:00PM MDT.
Between Jackson Creek Road and Whitleley Avenue (near Council). There is work on the shoulder. From 7:00AM MDT to 7:00PM MDT on weekdays. Until May 18, 2017.
Between 45th Parallel Road (3 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Look out for mobile maintenance operations. Expect delays.
Between Smokey Boulder Road (12 miles north of the New Meadows area) and Ranny Road (8 miles south of the Riggins area). The road is being repaved. The roadway is reduced to one lane. Look out for loose gravel on the roadway because a seal coat treatment has been applied. Expect 15 - minute delays. Until tomorrow at about 8:00AM PDT.
Between White Bird Creek Bridge and White Bird Hill Summit (5 miles north of the White Bird area). Road construction work is in progress. The road is being repaved. Look out for flaggers. Expect 15 - minute delays. From 6:00AM PDT to 6:00PM PDT on weekdays. Until July 6.
Between Evans Road and Hillside Road (near Genesee). Look out for a crash. Expect delays. Drive with extreme caution.
Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31.
Between A Street (1 mile north of the Plummer area) and First Street (near Worley). The road is being repaved. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Speed limit 45 MPH. Until September 21.