Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 95
US 95
Between River Dock Road and Copper Road (near Weiser). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. Width limit 10'0". From 8:00AM MDT to 5:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until today at about 11:59PM MDT.
Between Thomason Lane and West Indian Valley Road (6 miles north of the Cambridge area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. From 7:00AM MDT to 6:00PM MDT daily. Until October 17.
Between Thomason Lane (9 miles north of the Cambridge area) and Colt Street (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. Speed limit 45 MPH. From 7:00AM MDT to 6:00PM MDT daily. Until October 17.
Between Sportsman Access Road and Sportsman Access Road (6 miles south of the White Bird area). Bridge construction work is in progress. Until tomorrow at about 7:00PM PDT.
Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. Until October 10.
Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. Look out for loose gravel on the roadway. Until October 10.
Between Parks Road and Granite-Kelso Cut-Off Road (1 mile north of the Athol area). Look out for construction work.
Between County Road 2C and County Road 2F (near Bonners Ferry). There is work on the shoulder. The roadway is reduced to one lane. The right lane is closed. Look out for flaggers. Until October 9.