Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 95
US 95
Between Jackson Creek Road and Whitleley Avenue (near Council). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. A detour is in operation. Expect 5 - minute delays. From 7:00AM MDT to 7:00PM MDT on weekdays. Until May 18, 2017.
Between US Route 95 Business and Frontage Road (near Culdesac). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. Expect 15 - minute delays. Until October 19.
Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31.
Between A Street (1 mile north of the Plummer area) and First Street (near Worley). There is work on the shoulder. Speed limit 45 MPH. Expect 5 - minute delays. From 6:00AM PDT to 6:00PM PDT on weekdays. Until September 8.
Between Lakeshore Drive (1 mile south of the Sandpoint area) and Sandcreek Bypass Bridge (near Sandpoint). Be aware of narrow lanes because the road is being repaved. Road construction work is in progress. Width limit 12'0". Speed limit 35 MPH. Until Saturday, at about 6:00PM PDT.
Between County Road 56 and ID 1 (10 to 12 miles north of the Bonners Ferry area). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Width limit 12'0". From 6:00AM PDT to 4:00PM PDT on Monday, Tuesday, Wednesday and Thursday. Until Thursday, at about 4:00PM PDT.