Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 20
US 20: Road construction, paving operations, roadway reduced to one lane, work on the shoulder, look out for flaggers.
Between Jerico Road (near Eagle) and City Street (Boise). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. There is work on the shoulder. Look out for flaggers. From 10:00PM MDT to 5:00AM MDT daily. Until tomorrow at about 5:00AM MDT.
US 20: Roadway reduced to three lanes.
Between I-184 and Fourth Street (near Boise). The roadway is reduced to three lanes. Until March 31, 2017.
US 20 eastbound: Roadway reduced to three lanes, left lane closed.
Between Eighth Street and Fourth Street (near Boise). The roadway is reduced to three lanes. The left lane is closed. Until March 20, 2017.
US 20: Bridge maintenance operations, roadway reduced to one lane, work on the shoulder, right lane closed, delays.
At Exit 52: Federal Way (Boise). Bridge maintenance work is in progress. The roadway is reduced to one lane. There is work on the shoulder. The right lane is closed. Expect delays. Expect 15 - minute delays. From 10:00PM MDT to 5:00AM MDT daily. Until October 15.
US 20: Bridge maintenance operations, roadway reduced to one lane, single line traffic - alternating directions, paving operations, temporary traffic lights, delays, width limit in effect.
Between US 26 and School Avenue (near Carey). Bridge maintenance work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions. The road is being repaved. Look out for temporary traffic lights. Expect delays. There is a width limit in effect. Expect 5 - minute delays. Width limit 12'0". Until October 28.
US 20: Large animals on roadway.
Between The Truck Scale Port of Entry and Big Lost River Rest Area (3 to 10 miles east of the Butte City area). Look out for large animals on the roadway.
US 20 in both directions: Construction work, work on the shoulder.
Between I-15 and Exit 309: Science Drive (near Idaho Falls). Look out for construction work. There is work on the shoulder. From 7:00AM MDT to 5:00PM MDT on weekdays. Until December 2.
US 20: Road construction, roadway reduced to two lanes, construction traffic merging, speed restrictions in force.
Between I-15 and Exit 308: Riverside Drive (near Idaho Falls). Road construction work is in progress. The roadway is reduced to two lanes. Construction traffic may be merging. Speed restrictions are in force. Speed limit 25 MPH. Until November 15.
US 20 in both directions: Road construction, construction traffic merging, speed restrictions in force, width limit in effect, delays.
Between The Menan-Lorenzo Highway (3 miles east of the Rigby area) and ID 33 (Rexburg). Road construction work is in progress. Construction traffic may be merging. Speed restrictions are in force. There is a width limit in effect. Expect delays. Speed limit 55 MPH. Width limit 14'0". Expect 5 - minute delays. Until October 31.
US 20: Bridge construction, construction work, single line traffic - alternating directions, width limit in effect, speed restrictions in force, stop and go traffic.
Between The South Ashton City Limits and The Truck Scale Port of Entry (5 to 6 miles west of the Ashton area). Bridge construction work is in progress. Look out for construction work. Expect single line traffic alternating directions. There is a width limit in effect. Speed restrictions are in force. Traffic is stop and go. Width limit 17'0". Until October 7.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 20
Map of Reports on US 20 Between Jerico Road (near Eagle) and City Street (Boise). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. There is work on the shoulder. Look out for flaggers. From 10:00PM MDT to 5:00AM MDT daily. Until tomorrow at about 5:00AM MDT. Between The Truck Scale Port of Entry and Big Lost River Rest Area (3 to 10 miles east of the Butte City area). Look out for large animals on the roadway. Between I-15 and Exit 309: Science Drive (near Idaho Falls). Look out for construction work. There is work on the shoulder. From 7:00AM MDT to 5:00PM MDT on weekdays. Until December 2. Between The Menan-Lorenzo Highway (3 miles east of the Rigby area) and ID 33 (Rexburg). Road construction work is in progress. Construction traffic may be merging. Speed restrictions are in force. There is a width limit in effect. Expect delays. Speed limit 55 MPH. Width limit 14'0". Expect 5 - minute delays. Until October 31.
US 20: Road construction, paving operations, roadway reduced to one lane, work on the shoulder, look out for flaggers.
US 20: Roadway reduced to three lanes.
US 20 eastbound: Roadway reduced to three lanes, left lane closed.
US 20: Bridge maintenance operations, roadway reduced to one lane, work on the shoulder, right lane closed, delays.
US 20: Bridge maintenance operations, roadway reduced to one lane, single line traffic - alternating directions, paving operations, temporary traffic lights, delays, width limit in effect.
US 20: Large animals on roadway.
US 20 in both directions: Construction work, work on the shoulder.
US 20: Road construction, roadway reduced to two lanes, construction traffic merging, speed restrictions in force.
US 20 in both directions: Road construction, construction traffic merging, speed restrictions in force, width limit in effect, delays.
US 20: Bridge construction, construction work, single line traffic - alternating directions, width limit in effect, speed restrictions in force, stop and go traffic.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info