Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95
US 95: Road closed to traffic, bridge construction, look out for flaggers, speed restrictions in force, intersecting road closed.
Between Iest Road and US 20 (1 mile south of the Parma area). The road is closed to traffic. Bridge construction work is in progress. Look out for flaggers. Speed restrictions are in force. The intersecting road is closed. Speed limit 45 MPH. Until December 1, 2017 at about 7:00PM MDT.
US 95: Bridge construction, roadway reduced to one lane, delays, look out for flaggers, speed restrictions in force, width limit in effect.
Between River Dock Road and East Commercial Street (near Weiser). Bridge construction work is in progress. The roadway is reduced to one lane. Expect delays. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Expect 5 - minute delays. Speed limit 45 MPH. Width limit 14'0". Until December 5, 2017 at about 11:59PM MDT.
US 95: Bridge construction, roadway reduced to one lane, delays, look out for flaggers, width limit in effect, speed restrictions in force.
Between Thomason Lane (7 miles north of the Cambridge area) and Little Mud Creek Road (2 miles south of the New Meadows area). Bridge construction work is in progress. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 35 MPH. Expect 30 - minute delays. Until November 30, 2017 at about 7:00PM MDT.
US 95: Bridge construction, roadway reduced to one lane, observe signals, speed restrictions in force.
Between Smokey Boulder Road and County Road (15 miles north of the New Meadows area). Bridge construction work is in progress. The roadway is reduced to one lane. Observe the signals. Speed restrictions are in force. Speed limit 35 MPH. Until November 15, 2017 at about 5:00PM MDT.
US 95 in both directions: Road construction, work on the shoulder, roadway reduced to one lane, delays.
Between US Route 95 Business and Frontage Road (near Culdesac). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Expect 10 - minute delays. Until October 30, 2017 at about 5:30PM PDT.
US 95: Construction work, look out for flaggers, delays, stop and go traffic, width limit in effect, truck restrictions in force.
Between Sanders-Emida Road and Desmet Road (2 to 4 miles south of the Tensed area). Look out for construction work. Look out for flaggers. Expect delays. Traffic is stop and go. There is a width limit in effect. Truck restrictions are in force. Width limit 12'0". Until October 28, 2017 at about 11:59PM PDT.
US 95: Road open to traffic, a mandatory speed limit is in force.
Between County Road 5; County Road 7 and County Road 8 (6 miles south of the Bonners Ferry area). The road is open to traffic. A mandatory speed limit is in force.
US 95 in both directions: Road construction, work on the shoulder, speed restrictions in force.
Between ID 1 and The Canadian Border (17 to 27 miles north of the Bonners Ferry area). Road construction work is in progress. There is work on the shoulder. Speed restrictions are in force. Truck speed limit 25 MPH. Speed limit 25 MPH.
Switch to Truck Restrictions
Reports on US 95
Map of Reports on US 95 Between Thomason Lane (7 miles north of the Cambridge area) and Little Mud Creek Road (2 miles south of the New Meadows area). Bridge construction work is in progress. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 35 MPH. Expect 30 - minute delays. Until November 30, 2017 at about 7:00PM MDT. Between US Route 95 Business and Frontage Road (near Culdesac). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Expect 10 - minute delays. Until October 30, 2017 at about 5:30PM PDT. Between Sanders-Emida Road and Desmet Road (2 to 4 miles south of the Tensed area). Look out for construction work. Look out for flaggers. Expect delays. Traffic is stop and go. There is a width limit in effect. Truck restrictions are in force. Width limit 12'0". Until October 28, 2017 at about 11:59PM PDT. Between ID 1 and The Canadian Border (17 to 27 miles north of the Bonners Ferry area). Road construction work is in progress. There is work on the shoulder. Speed restrictions are in force. Truck speed limit 25 MPH. Speed limit 25 MPH.
US 95: Road closed to traffic, bridge construction, look out for flaggers, speed restrictions in force, intersecting road closed.
US 95: Bridge construction, roadway reduced to one lane, delays, look out for flaggers, speed restrictions in force, width limit in effect.
US 95: Bridge construction, roadway reduced to one lane, delays, look out for flaggers, width limit in effect, speed restrictions in force.
US 95: Bridge construction, roadway reduced to one lane, observe signals, speed restrictions in force.
US 95 in both directions: Road construction, work on the shoulder, roadway reduced to one lane, delays.
US 95: Construction work, look out for flaggers, delays, stop and go traffic, width limit in effect, truck restrictions in force.
US 95: Road open to traffic, a mandatory speed limit is in force.
US 95 in both directions: Road construction, work on the shoulder, speed restrictions in force.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info