Between Exit 58: US 30 and Exit 63 (near Pocatello). The roadway is reduced to one lane. There are alternating lane closures. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. Look out for flaggers. Speed restrictions are in force. Truck restrictions are in force. Ramp restrictions are in force. Drive with extreme caution. Speed limit 60 MPH. Until November 1.
Between Exit 58: US 30 and Exit 63 (near Pocatello). The roadway is reduced to one lane. There are alternating lane closures. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. Look out for flaggers. Speed restrictions are in force. Truck restrictions are in force. Ramp restrictions are in force. Drive with extreme caution. Speed limit 60 MPH. Until November 1.
Comment: This bridge and shoulder work project is on I-86 between milepost 60.857, near the I-86 and US-91 interchange, and milepost 61.503, Chubbuck Bridge. Expect lane restrictions between 8:00 p.m. and 6:00 a.m. Width restriction of 13' due to concrete guardrail protecting work zones, and a height restriction of 16' are on ramps. Motorists should use extreme caution around crews and equipment.
Last updated
on May 22