Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 95
US 95
Between I-84 and US 30; 16th Street North (1 mile south of the Fruitland area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Look out for loose gravel on the roadway. Expect delays. There is a width limit in effect. There is a length limit in effect. Consider using an alternate route. Expect 15 - minute delays. Width limit 12'0". Vehicle length limit 35 ft. Until July 2.
Between Mill Creek Road (1 mile north of the Council area) and Lost Valley Reservoir Road (9 miles south of the New Meadows area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. From 8:00AM MDT to 4:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays.
Between Taylor Street and The East Fork Goose Creek Bridge (near New Meadows). Road construction work is in progress. Bridge maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH. Width limit 14'4". Until June 15.
Between Exit 312 and Leon Road (6 miles north of the Lewiston area). Road construction work is in progress. There is a width limit in effect. Width limit 11'0". Advisory speed limit 45 MPH. Until September 8.
Between Conkling Road and ID 58 (1 mile north of the Worley area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for flaggers. Consider using an alternate route. Reduce your speed. There is a width limit in effect. Width limit 12'0". Speed limit 35 MPH. Until October 31.