Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on US 95
US 95
Between Smokey Boulder Road and County Road (14 miles north of the New Meadows area). Bridge maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. There is a width limit in effect. Expect 5 - minute delays. Width limit 10'0". From 8:00AM MDT to 5:00PM MDT on weekdays. Until Friday, at about 5:00PM MDT.
Between US 12 (3 miles north of the Lapwai area) and Exit 312 (Lewiston). Look out for a wide load. Until today at about 8:00AM MDT.
Between Parks Road and Granite-Kelso Cut-Off Road (2 miles north of the Athol area). Traffic is slow. Look out for a new road layout. The normal road layout has been restored. The normal traffic lanes have been restored.
Between Parks Road and Granite-Kelso Cut-Off Road (1 mile north of the Athol area). Look out for construction work.