US 20: Road construction, paving operations, roadway reduced to one lane, look out for flaggers, delays, consider using an alternate route, speed restrictions in force, sidewalk closed.
Between Jerico Road (near Eagle) and City Street (Boise). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Consider using an alternate route. Speed restrictions are in force. The sidewalk is closed. Truck speed limit 35 MPH. From 10:00PM MDT to 5:00AM MDT daily. Until Sunday, at about 7:00AM MDT.
US 20: Roadway reduced to three lanes.
Between I-184 and Fourth Street (near Boise). The roadway is reduced to three lanes. Until March 31, 2017.
US 20 eastbound: Roadway reduced to three lanes, left lane closed.
Between Eighth Street and Fourth Street (near Boise). The roadway is reduced to three lanes. The left lane is closed. Until March 20, 2017.
US 20: Road closed to traffic, due to bridge construction work, detour in operation.
Between Avenue A and University Drive (near Boise). The road is closed to traffic due to bridge construction work. A detour is in operation. Until October 1.
US 20: Bridge maintenance operations, roadway reduced to one lane, work on the shoulder, right lane closed, delays.
At Exit 52: Federal Way (Boise). Bridge maintenance work is in progress. The roadway is reduced to one lane. There is work on the shoulder. The right lane is closed. Expect delays. Expect 15 - minute delays. From 10:00PM MDT to 5:00AM MDT daily. Until October 15.
US 20: Bridge maintenance operations, roadway reduced to one lane, single line traffic - alternating directions, paving operations, temporary traffic lights, delays, speed restrictions in force, width limit in effect.
Between Stocker Creek Road - Pumpkin Center Road (10 miles west of the Carey area) and Circle Drive (near Carey). Bridge maintenance work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions. The road is being repaved. Look out for temporary traffic lights. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 5 - minute delays. Speed limit 35 MPH. Width limit 12'0". Until September 30.
US 20: Large animals on roadway.
Between The Truck Scale Port of Entry and Big Lost River Rest Area (3 to 10 miles east of the Butte City area). Look out for large animals on the roadway.
US 20: Road construction, roadway reduced to two lanes, construction traffic merging, speed restrictions in force.
Between I-15 and Exit 308: Riverside Drive (near Idaho Falls). Road construction work is in progress. The roadway is reduced to two lanes. Construction traffic may be merging. Speed restrictions are in force. Speed limit 25 MPH. Until November 15.
US 20 in both directions: Road construction, seal coat, road marking operations.
Between Exit 309: Science Drive (Idaho Falls) and 6800 South Road (3 miles east of the Rigby area). Road construction work is in progress. A seal coat treatment has been applied. Road marking work is in progress. From 8:00AM MDT to 8:00PM MDT daily. Until September 2.
US 20 in both directions: Road construction, construction traffic merging, speed restrictions in force, width limit in effect, delays.
Between The Menan-Lorenzo Highway (3 miles east of the Rigby area) and ID 33 (Rexburg). Road construction work is in progress. Construction traffic may be merging. Speed restrictions are in force. There is a width limit in effect. Expect delays. Speed limit 55 MPH. Width limit 14'0". Expect 5 - minute delays. Until October 31.
US 20 in both directions: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force.
Between Exit 332: South Rexburg and Exit 337: Salem Road (near Rexburg). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 45 MPH. Width limit 12'0". Until August 31.
US 20: Road construction, paving operations, look out for flaggers, traffic is being held. Expect delays, width limit in effect, speed restrictions in force.
Between 2775 North Road (4 miles west of the Island Park area) and Sawtelle Road (Island Park). Road construction work is in progress. The road is being repaved. Look out for flaggers. Traffic is being held. Expect delays. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". From 7:00AM MDT to 8:00PM MDT on Mondays and from 6:00AM MDT to 8:00PM MDT on Tuesdays, Wednesdays and Thursdays. Until September 15.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 20
Map of Reports on US 20 Between Jerico Road (near Eagle) and City Street (Boise). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Consider using an alternate route. Speed restrictions are in force. The sidewalk is closed. Truck speed limit 35 MPH. From 10:00PM MDT to 5:00AM MDT daily. Until Sunday, at about 7:00AM MDT. Between Avenue A and University Drive (near Boise). The road is closed to traffic due to bridge construction work. A detour is in operation. Until October 1. Between Stocker Creek Road - Pumpkin Center Road (10 miles west of the Carey area) and Circle Drive (near Carey). Bridge maintenance work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions. The road is being repaved. Look out for temporary traffic lights. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 5 - minute delays. Speed limit 35 MPH. Width limit 12'0". Until September 30. Between The Truck Scale Port of Entry and Big Lost River Rest Area (3 to 10 miles east of the Butte City area). Look out for large animals on the roadway. Between Exit 309: Science Drive (Idaho Falls) and 6800 South Road (3 miles east of the Rigby area). Road construction work is in progress. A seal coat treatment has been applied. Road marking work is in progress. From 8:00AM MDT to 8:00PM MDT daily. Until September 2. Between The Menan-Lorenzo Highway (3 miles east of the Rigby area) and ID 33 (Rexburg). Road construction work is in progress. Construction traffic may be merging. Speed restrictions are in force. There is a width limit in effect. Expect delays. Speed limit 55 MPH. Width limit 14'0". Expect 5 - minute delays. Until October 31. Between Exit 332: South Rexburg and Exit 337: Salem Road (near Rexburg). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 45 MPH. Width limit 12'0". Until August 31. Between 2775 North Road (4 miles west of the Island Park area) and Sawtelle Road (Island Park). Road construction work is in progress. The road is being repaved. Look out for flaggers. Traffic is being held. Expect delays. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". From 7:00AM MDT to 8:00PM MDT on Mondays and from 6:00AM MDT to 8:00PM MDT on Tuesdays, Wednesdays and Thursdays. Until September 15.
US 20: Road construction, paving operations, roadway reduced to one lane, look out for flaggers, delays, consider using an alternate route, speed restrictions in force, sidewalk closed.
US 20: Roadway reduced to three lanes.
US 20 eastbound: Roadway reduced to three lanes, left lane closed.
US 20: Road closed to traffic, due to bridge construction work, detour in operation.
US 20: Bridge maintenance operations, roadway reduced to one lane, work on the shoulder, right lane closed, delays.
US 20: Bridge maintenance operations, roadway reduced to one lane, single line traffic - alternating directions, paving operations, temporary traffic lights, delays, speed restrictions in force, width limit in effect.
US 20: Large animals on roadway.
US 20: Road construction, roadway reduced to two lanes, construction traffic merging, speed restrictions in force.
US 20 in both directions: Road construction, seal coat, road marking operations.
US 20 in both directions: Road construction, construction traffic merging, speed restrictions in force, width limit in effect, delays.
US 20 in both directions: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force.
US 20: Road construction, paving operations, look out for flaggers, traffic is being held. Expect delays, width limit in effect, speed restrictions in force.