Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 39
ID 39 in both directions: Road construction, paving operations, work on the shoulder, look out for flaggers, width limit in effect.
Between Center Street and Trego Road (1 to 2 miles west of the Blackfoot area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for flaggers. There is a width limit in effect. Width limit 12'0". From 5:00AM MDT to 3:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until July 25, 2017 at about 5:30PM MDT.
Switch to Truck Restrictions
Reports on ID 39
Map of Reports on ID 39 Between Center Street and Trego Road (1 to 2 miles west of the Blackfoot area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for flaggers. There is a width limit in effect. Width limit 12'0". From 5:00AM MDT to 3:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until July 25, 2017 at about 5:30PM MDT.
ID 39 in both directions: Road construction, paving operations, work on the shoulder, look out for flaggers, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info