Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 12
Between Harris Ride Road and Selway River Road (6 to 15 miles east of the Kooskia area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. There is a width limit in effect. Expect 15 - minute delays. Width limit 12'0". From 7:00AM PDT to 7:00PM PDT on weekdays. Until July 12.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 12
Map of Reports on US 12 Between Harris Ride Road and Selway River Road (6 to 15 miles east of the Kooskia area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. There is a width limit in effect. Expect 15 - minute delays. Width limit 12'0". From 7:00AM PDT to 7:00PM PDT on weekdays. Until July 12.
US 12 in both directions: Road construction, paving operations, roadway reduced to one lane, look out for flaggers, pilot car in operation, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info