Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 3
ID 3 northbound: Emergency repairs, drive with extreme caution, work on the shoulder.
Between Wauncher Gulch Road and Bethany Road (1 mile north of the Kendrick area). Emergency repairs are in progress. Drive with extreme caution. There is work on the shoulder. Expect 15 - minute delays. Until January 12, 2018 at about 5:00PM PST.
ID 3 in both directions: Bridge construction, look out for flaggers.
Between ID 5; Third Street and Saint Joe River Road (near St. Maries). Bridge construction work is in progress. Look out for flaggers. From 7:00AM PST to 7:00PM PST daily. Until December 1, 2017 at about 11:59PM PST.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on ID 3
Map of Reports on ID 3 Between Wauncher Gulch Road and Bethany Road (1 mile north of the Kendrick area). Emergency repairs are in progress. Drive with extreme caution. There is work on the shoulder. Expect 15 - minute delays. Until January 12, 2018 at about 5:00PM PST. Between ID 5; Third Street and Saint Joe River Road (near St. Maries). Bridge construction work is in progress. Look out for flaggers. From 7:00AM PST to 7:00PM PST daily. Until December 1, 2017 at about 11:59PM PST.
ID 3 northbound: Emergency repairs, drive with extreme caution, work on the shoulder.
ID 3 in both directions: Bridge construction, look out for flaggers.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info