Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95
US 95: Bridge maintenance operations, roadway reduced to one lane, look out for flaggers, short delays, width limit in effect.
Between Smokey Boulder Road and County Road (14 miles north of the New Meadows area). Bridge maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. There is a width limit in effect. Expect 5 - minute delays. Width limit 10'0". From 8:00AM MDT to 5:00PM MDT on weekdays. Until today at about 5:00PM MDT.
US 95 in both directions: Slow traffic, new road layout, normal road layout restored, normal traffic lanes restored.
Between Parks Road and Granite-Kelso Cut-Off Road (2 miles north of the Athol area). Traffic is slow. Look out for a new road layout. The normal road layout has been restored. The normal traffic lanes have been restored.
US 95: Construction work.
Between Parks Road and Granite-Kelso Cut-Off Road (1 mile north of the Athol area). Look out for construction work.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 95
Map of Reports on US 95 Between Parks Road and Granite-Kelso Cut-Off Road (2 miles north of the Athol area). Traffic is slow. Look out for a new road layout. The normal road layout has been restored. The normal traffic lanes have been restored. Between Parks Road and Granite-Kelso Cut-Off Road (1 mile north of the Athol area). Look out for construction work.
US 95: Bridge maintenance operations, roadway reduced to one lane, look out for flaggers, short delays, width limit in effect.
US 95 in both directions: Slow traffic, new road layout, normal road layout restored, normal traffic lanes restored.
US 95: Construction work.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info