Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 30
US 30: Road maintenance operations, roadway reduced to two lanes, because the road is being repaved, center lane closed, delays.
Between 21st Street and I-84; ID 24 (near Heyburn). Road maintenance work is in progress. The roadway is reduced to two lanes because the road is being repaved. The center lane is closed. Expect delays. From 8:00AM MDT to 5:00PM MDT on Monday, Thursday and Friday. Until today at about 5:00PM MDT.
US 30 in both directions: Roadway reduced to one lane, bridge maintenance operations, truck restrictions in force, width limit in effect, speed restrictions in force.
Between I-86 and East County Road (near Arbon Valley). The roadway is reduced to one lane. Bridge maintenance work is in progress. Truck restrictions are in force. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 65 MPH. Until November 30.
US 30: Roadway reduced to one lane, road construction.
At Carter Street (Pocatello). The roadway is reduced to one lane. Road construction work is in progress. Until October 1.
US 30 in both directions: Roadway reduced to one lane, road construction, paving operations, delays, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect, truck restrictions in force, if weather permits.
Between Banks Valley Road and Pegram Road (6 to 11 miles east of the Montpelier area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Expect delays. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Truck restrictions are in force. If weather permits. Speed limit 55 MPH. Width limit 12'0". Expect 15 - minute delays. Until September 30.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 30
Map of Reports on US 30 Between 21st Street and I-84; ID 24 (near Heyburn). Road maintenance work is in progress. The roadway is reduced to two lanes because the road is being repaved. The center lane is closed. Expect delays. From 8:00AM MDT to 5:00PM MDT on Monday, Thursday and Friday. Until today at about 5:00PM MDT. Between Banks Valley Road and Pegram Road (6 to 11 miles east of the Montpelier area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Expect delays. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Truck restrictions are in force. If weather permits. Speed limit 55 MPH. Width limit 12'0". Expect 15 - minute delays. Until September 30.
US 30: Road maintenance operations, roadway reduced to two lanes, because the road is being repaved, center lane closed, delays.
US 30 in both directions: Roadway reduced to one lane, bridge maintenance operations, truck restrictions in force, width limit in effect, speed restrictions in force.
US 30: Roadway reduced to one lane, road construction.
US 30 in both directions: Roadway reduced to one lane, road construction, paving operations, delays, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect, truck restrictions in force, if weather permits.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info