I-84
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until October 31.
I-84 westbound: Entrance ramp closed, exit ramp closed, detour in operation.
At Exit 9: US 30 (8 miles east of the Fruitland area). The entrance ramp is closed. The exit ramp is closed. A detour is in operation. Until September 19.
I-84 westbound: Slow traffic.
Between Exit 29: US 20; Franklin Road and Exit 44: ID 69 (near Nampa). Traffic is slow.
I-84 westbound: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, detour in operation, speed restrictions in force.
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Speed restrictions are in force. Speed limit 55 MPH. Width limit 10'0". Until October 3.
I-84 eastbound: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 18'0". Until October 3.
I-84 eastbound: Delays, changing traffic patterns.
Between Exit 29: US 20; Franklin Road and Exit 35: ID 55; Nampa Boulevard (Nampa). Expect delays. Expect changing traffic patterns.
I-84: Road construction, bridge construction, roadway reduced to two lanes, left lane closed, speed restrictions in force.
Between Exit 38: I-84B (Meridian) and I-184 (Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to two lanes. The left lane is closed. Speed restrictions are in force. Speed limit 55 MPH. Until October 31, 2015.
I-84 westbound: Stop and go traffic.
Between ID 55 and Exit 50: Overland Road (near Boise). Traffic is stop and go.
I-84: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, work on the shoulder, work in the median, speed restrictions in force.
Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH. Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015.
I-84: Road closed to traffic, detour in operation.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). The road is closed to traffic. A detour is in operation. From 7:00PM MDT to 11:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until tomorrow at about 11:00PM MDT.
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. Until October 1, 2015.
I-84 eastbound: Entrance ramp closed.
At Exit 57: Gowen Road (Boise). The entrance ramp is closed. Until August 29.
I-84 eastbound: Disabled semi trailer, on the off ramp, ramp blocked.
Between ID 21 and Exit 60: The Isaacs Canyon Interchange (Boise). Look out for a disabled semi trailer. On the off ramp. The ramp is blocked.
I-84: Road construction, paving operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between The Boise Port of Entry and Exit 74: Simco Road (8 to 12 miles east of the Boise area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 16'0". Until August 15.
I-84 westbound: Entrance ramp closed.
At Exit 71: Mayfield Road (11 miles east of the Boise area). The entrance ramp is closed. Until August 15.
I-84: Bridge maintenance operations, traffic restrictions in force, on, overpass, roadway reduced to one lane, width limit in effect.
At Exit 125: 18th East Street (3 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. Traffic restrictions are in force. On. Overpass. The roadway is reduced to one lane. There is a width limit in effect. Width limit 13'0". Until August 29.
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until August 29.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-84
Map of Reports on I-84 Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until October 31. Between Exit 29: US 20; Franklin Road and Exit 44: ID 69 (near Nampa). Traffic is slow. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Speed restrictions are in force. Speed limit 55 MPH. Width limit 10'0". Until October 3. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 18'0". Until October 3. Between Exit 38: I-84B (Meridian) and I-184 (Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to two lanes. The left lane is closed. Speed restrictions are in force. Speed limit 55 MPH. Until October 31, 2015. Between ID 55 and Exit 50: Overland Road (near Boise). Traffic is stop and go. Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH. Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). The road is closed to traffic. A detour is in operation. From 7:00PM MDT to 11:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until tomorrow at about 11:00PM MDT. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. Until October 1, 2015. Between The Boise Port of Entry and Exit 74: Simco Road (8 to 12 miles east of the Boise area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 16'0". Until August 15. Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until August 29.
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84 westbound: Entrance ramp closed, exit ramp closed, detour in operation.
I-84 westbound: Slow traffic.
I-84 westbound: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, detour in operation, speed restrictions in force.
I-84 eastbound: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
I-84 eastbound: Delays, changing traffic patterns.
I-84: Road construction, bridge construction, roadway reduced to two lanes, left lane closed, speed restrictions in force.
I-84 westbound: Stop and go traffic.
I-84: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, work on the shoulder, work in the median, speed restrictions in force.
I-84: Road closed to traffic, detour in operation.
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force.
I-84 eastbound: Entrance ramp closed.
I-84 eastbound: Disabled semi trailer, on the off ramp, ramp blocked.
I-84: Road construction, paving operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84 westbound: Entrance ramp closed.
I-84: Bridge maintenance operations, traffic restrictions in force, on, overpass, roadway reduced to one lane, width limit in effect.
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.