Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on ID 75
ID 75
Between Broadway Run Road and Elkhorn Road; River Ranch Road (near Sun Valley). Look out for long term road construction work. Bridge construction work is in progress. The roadway is reduced to two lanes. Expect delays. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH. Width limit 14'0". Until September 15, 2017.
Between Chocolate Gulch Road and Boulder Creek Road (4 to 7 miles north of the Ketchum area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Expect 5 - minute delays. From 7:00AM MDT to 5:00PM MDT on Monday, Tuesday and Wednesday. Until tomorrow at about 5:00PM MDT.
Between North Cherry Creek Road (19 miles north of the Ketchum area) and Salmon River Road (28 miles south of the Stanley area). Look out for construction work. A seal coat treatment has been applied. Look out for loose gravel on the roadway. Expect single line traffic alternating directions. Expect delays. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. Expect 15 - minute delays. Speed limit 35 MPH. From 8:00AM MDT to 7:00PM MDT on weekdays. Until Friday, at about 5:00PM MDT.
Between Redfish Lake Road (near Stanley) and Squaw Creek Road (5 miles south of the Clayton area). There is danger of a rock fall. Look out for large animals on the roadway.