I-84
I-84: Road construction, speed restrictions in force, roadway reduced to one lane, seal coat, loose gravel.
Between The Oregon State Line and Exit 17: Sand Hollow (12 miles east of the Fruitland area). Road construction work is in progress. Speed restrictions are in force. The roadway is reduced to one lane. A seal coat treatment has been applied. Look out for loose gravel on the roadway. Speed limit 55 MPH. Until June 10.
I-84 in both directions: Road maintenance operations, mobile maintenance operations.
Between The Oregon State Line (near Fruitland) and Exit 26: US 20 (near Caldwell). Road maintenance work is in progress. Look out for mobile maintenance operations. Until today at about 9:00PM MDT.
I-84 westbound: Entrance ramp closed, exit ramp closed, detour in operation.
At Exit 9: US 30 (8 miles east of the Fruitland area). The entrance ramp is closed. The exit ramp is closed. A detour is in operation. Until June 7.
I-84: Road construction, on the on ramp, roadway reduced to one lane.
At Exit 38: I-84B (Nampa). Road construction work is in progress. On the on ramp. The roadway is reduced to one lane. Speed limit 35 MPH. From 10:00PM MDT to 5:00AM MDT on weekdays. Until June 6.
I-84 in both directions: Bridge maintenance operations, alternating lane closures, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 121 and Exit 125: 18th East Street (near Glenns Ferry). Bridge maintenance work is in progress. There are alternating lane closures. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until June 16.
I-84 in both directions: Bridge maintenance operations, alternating lane closures, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 125: 18th East Street and Exit 129: Parks Loop Road (5 to 6 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. There are alternating lane closures. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until June 16.
I-84 westbound: Road maintenance operations, left lane closed, because the road is being repaved, speed restrictions in force, width limit in effect.
Between Exit 194: ID 25; Ridgeway Road and I-84 (6 miles west of the Hazelton area). Road maintenance work is in progress. The left lane is closed because the road is being repaved. Speed restrictions are in force. There is a width limit in effect. Width limit 13'0". Speed limit 65 MPH. From 8:00AM MDT to 5:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until June 8, 2017.
I-84: Bridge maintenance operations, left lane closed, width limit in effect, short delays.
Between Exit 188: Valley Road and Exit 194: ID 25; Ridgeway Road (near Hazelton). Bridge maintenance work is in progress. The left lane is closed. There is a width limit in effect. Short delays are possible. Width limit 16'0". Until June 9.
I-84 in both directions: Long term road construction, due to bridge construction work, roadway reduced to two lanes, speed restrictions in force, width limit in effect, drive with extreme caution.
Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 to 6 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH. Width limit 12'0". Until June 2, 2017.
I-84 in both directions: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect.
Between Sweetzer Summit and The Utah State Line (57 to 65 miles east of the Heyburn area). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until July 29.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-84
Map of Reports on I-84 Between The Oregon State Line and Exit 17: Sand Hollow (12 miles east of the Fruitland area). Road construction work is in progress. Speed restrictions are in force. The roadway is reduced to one lane. A seal coat treatment has been applied. Look out for loose gravel on the roadway. Speed limit 55 MPH. Until June 10. Between The Oregon State Line (near Fruitland) and Exit 26: US 20 (near Caldwell). Road maintenance work is in progress. Look out for mobile maintenance operations. Until today at about 9:00PM MDT. Between Exit 121 and Exit 125: 18th East Street (near Glenns Ferry). Bridge maintenance work is in progress. There are alternating lane closures. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until June 16. Between Exit 194: ID 25; Ridgeway Road and I-84 (6 miles west of the Hazelton area). Road maintenance work is in progress. The left lane is closed because the road is being repaved. Speed restrictions are in force. There is a width limit in effect. Width limit 13'0". Speed limit 65 MPH. From 8:00AM MDT to 5:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until June 8, 2017. Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 to 6 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH. Width limit 12'0". Until June 2, 2017. Between Sweetzer Summit and The Utah State Line (57 to 65 miles east of the Heyburn area). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until July 29.
I-84: Road construction, speed restrictions in force, roadway reduced to one lane, seal coat, loose gravel.
I-84 in both directions: Road maintenance operations, mobile maintenance operations.
I-84 westbound: Entrance ramp closed, exit ramp closed, detour in operation.
I-84: Road construction, on the on ramp, roadway reduced to one lane.
I-84 in both directions: Bridge maintenance operations, alternating lane closures, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84 in both directions: Bridge maintenance operations, alternating lane closures, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84 westbound: Road maintenance operations, left lane closed, because the road is being repaved, speed restrictions in force, width limit in effect.
I-84: Bridge maintenance operations, left lane closed, width limit in effect, short delays.
I-84 in both directions: Long term road construction, due to bridge construction work, roadway reduced to two lanes, speed restrictions in force, width limit in effect, drive with extreme caution.
I-84 in both directions: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info