Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 12
US 12 in both directions: Road construction, roadway reduced to one lane, look out for flaggers, drive with extreme caution.
Between ID 3 (11 miles east of Lewiston) and Bobbit Bench Road (4 miles west of the Orofino area). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Drive with extreme caution. Expect 30 - minute delays. Speed limit 45 MPH. From 6:00AM PDT to 6:00PM PDT on weekdays and Saturdays. Until November 17.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 12
Map of Reports on US 12 Between ID 3 (11 miles east of Lewiston) and Bobbit Bench Road (4 miles west of the Orofino area). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Drive with extreme caution. Expect 30 - minute delays. Speed limit 45 MPH. From 6:00AM PDT to 6:00PM PDT on weekdays and Saturdays. Until November 17.
US 12 in both directions: Road construction, roadway reduced to one lane, look out for flaggers, drive with extreme caution.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info