Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-90
I-90: Long term road construction, roadway reduced to two lanes, width limit in effect.
Between Exit 13: 4th Street and Exit 15: Sherman Avenue (near Coeur d'Alene). Look out for long term road construction work. The roadway is reduced to two lanes. There is a width limit in effect. Speed limit 55 MPH.
I-90 eastbound: Road construction, roadway reduced to one lane.
Between Exit 34: ID 3 and Exit 40: Cataldo (3 to 9 miles west of the Pinehurst area). Road construction work is in progress. The roadway is reduced to one lane. Speed limit 55 MPH. From 4:00AM PDT to 2:00PM PDT on weekdays. Until Friday, at about 7:00PM PDT.
I-90 eastbound: Road construction, exit ramp closed, roadway reduced to one lane.
Between Exit 48: Airport Road and Exit 50: Hill Street (near Kellogg). Road construction work is in progress. The exit ramp is closed. The roadway is reduced to one lane. Width limit 14'0". Speed limit 45 MPH. Until August 9, 2017 at about 6:00PM MDT.
I-90: Road construction, intermittent lane closure, construction traffic merging.
Between Exit 48: Airport Road (near Kellogg) and Exit 61: Wallace West (near Wallace). Road construction work is in progress. A lane is closed intermittently. Construction traffic may be merging. Width limit 14'0". Speed limit 45 MPH. Until September 28, 2017 at about 5:00PM PDT.
I-90 eastbound: Road construction, exit ramp closed, roadway reduced to one lane.
Between Exit 57: 3rd Street (Osburn) and Exit 61: Wallace West (near Wallace). Road construction work is in progress. The exit ramp is closed. The roadway is reduced to one lane. Speed limit 45 MPH. Width limit 14'0". Until August 11, 2017 at about 11:59PM PDT.
Switch to Truck Restrictions
Reports on I-90
Map of Reports on I-90 Between Exit 13: 4th Street and Exit 15: Sherman Avenue (near Coeur d'Alene). Look out for long term road construction work. The roadway is reduced to two lanes. There is a width limit in effect. Speed limit 55 MPH. Between Exit 34: ID 3 and Exit 40: Cataldo (3 to 9 miles west of the Pinehurst area). Road construction work is in progress. The roadway is reduced to one lane. Speed limit 55 MPH. From 4:00AM PDT to 2:00PM PDT on weekdays. Until Friday, at about 7:00PM PDT. Between Exit 48: Airport Road and Exit 50: Hill Street (near Kellogg). Road construction work is in progress. The exit ramp is closed. The roadway is reduced to one lane. Width limit 14'0". Speed limit 45 MPH. Until August 9, 2017 at about 6:00PM MDT. Between Exit 48: Airport Road (near Kellogg) and Exit 61: Wallace West (near Wallace). Road construction work is in progress. A lane is closed intermittently. Construction traffic may be merging. Width limit 14'0". Speed limit 45 MPH. Until September 28, 2017 at about 5:00PM PDT. Between Exit 57: 3rd Street (Osburn) and Exit 61: Wallace West (near Wallace). Road construction work is in progress. The exit ramp is closed. The roadway is reduced to one lane. Speed limit 45 MPH. Width limit 14'0". Until August 11, 2017 at about 11:59PM PDT.
I-90: Long term road construction, roadway reduced to two lanes, width limit in effect.
I-90 eastbound: Road construction, roadway reduced to one lane.
I-90 eastbound: Road construction, exit ramp closed, roadway reduced to one lane.
I-90: Road construction, intermittent lane closure, construction traffic merging.
I-90 eastbound: Road construction, exit ramp closed, roadway reduced to one lane.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info