Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Reports on ID 46
ID 46
Between Curtis Snake River Bridge and East 3600 South (4 miles north of the Buhl area). Bridge maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 5 - minute delays. Speed limit 25 MPH. Width limit 12'0". Until July 31.
Between East 3100 South Road and North Wendell Road (near Wendell). Major road construction work is in progress. The roadway is reduced to two lanes because the road is being repaved. Look out for flaggers. Expect delays. There is a width limit in effect. The sidewalk is closed. Expect 15 - minute delays. Width limit 12'0". Until September 25.
Between Eighth Avenue (Wendell) (near Wendell) and 22nd Avenue (Gooding). Road construction work is in progress. The roadway is reduced to one lane because the road is being repaved. Expect delays. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. There is a width limit in effect. Look out for loose gravel on the roadway. Speed limit 45 MPH. Width limit 12'0". Expect 15 - minute delays. From 7:00AM MDT to 8:00PM MDT daily. Until Thursday, at about 8:00PM MDT.