Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 33
ID 33 in both directions: Road construction.
Between Bott Road; Green Road and The Sage Junction Port of Entry (5 to 12 miles east of the Mud Lake area). Road construction work is in progress. Until Friday, at about 5:30PM MDT.
ID 33: Bridge maintenance operations, roadway reduced to one lane, delays.
Between 2000 South Road; Plano Road and 5500 West Road (4 miles west of the Rexburg area). Bridge maintenance work is in progress. The roadway is reduced to one lane. Expect delays. Expect 15 - minute delays. Until October 17.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on ID 33
Map of Reports on ID 33 Between Bott Road; Green Road and The Sage Junction Port of Entry (5 to 12 miles east of the Mud Lake area). Road construction work is in progress. Until Friday, at about 5:30PM MDT.
ID 33 in both directions: Road construction.
ID 33: Bridge maintenance operations, roadway reduced to one lane, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info