Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95
US 95: Slow moving maintenance vehicle.
Between Cox Road (4 miles north of the Payette area) and Ross Road (near Weiser). Look out for a slow moving maintenance vehicle. Until today at about 4:30PM MDT.
US 95: Road maintenance operations, roadway reduced to one lane, look out for flaggers, short delays.
Between Crystal Lane (3 miles south of the Weiser area) and Appleton Lane (Weiser). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. Until today at about 4:30PM MDT.
US 95 in both directions: Road construction, paving operations, look out for flaggers.
Between White Bird Creek Bridge and White Bird Hill Summit (5 miles north of the White Bird area). Road construction work is in progress. The road is being repaved. Look out for flaggers. Expect 15 - minute delays. From 6:00AM PDT to 6:00PM PDT on weekdays. Until July 6.
US 95 in both directions: Road construction, delays, look out for flaggers.
Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 95
Map of Reports on US 95 Between Cox Road (4 miles north of the Payette area) and Ross Road (near Weiser). Look out for a slow moving maintenance vehicle. Until today at about 4:30PM MDT. Between Crystal Lane (3 miles south of the Weiser area) and Appleton Lane (Weiser). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. Until today at about 4:30PM MDT. Between White Bird Creek Bridge and White Bird Hill Summit (5 miles north of the White Bird area). Road construction work is in progress. The road is being repaved. Look out for flaggers. Expect 15 - minute delays. From 6:00AM PDT to 6:00PM PDT on weekdays. Until July 6. Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31.
US 95: Slow moving maintenance vehicle.
US 95: Road maintenance operations, roadway reduced to one lane, look out for flaggers, short delays.
US 95 in both directions: Road construction, paving operations, look out for flaggers.
US 95 in both directions: Road construction, delays, look out for flaggers.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info