Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 55
ID 55 southbound: Road construction, roadway reduced to one lane, work on the shoulder, look out for flaggers, delays.
Between I-84 and Franklin Road (Meridian). Road construction work is in progress. The roadway is reduced to one lane. There is work on the shoulder. Look out for flaggers. Expect delays. Speed limit 40 MPH. Expect 10 - minute delays. From 10:00PM MDT to 5:00AM MDT on Sundays, Mondays, Tuesdays, Wednesdays and Thursdays. Until September 4.
ID 55 northbound: Roadway reduced to one lane, disabled semi trailer.
Between Pleasant Acres Drive and Rogers Lane; Heinrick Road (2 miles south of the McCall area). The roadway is reduced to one lane. Look out for a disabled semi trailer.
ID 55 in both directions: Bridge construction, roadway reduced to one lane, delays, look out for flaggers, width limit in effect.
Between Mather Road and Neal Street (McCall). Bridge construction work is in progress. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Expect 10 - minute delays. Width limit 14'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 24.
ID 55: Road construction, roadway reduced to one lane, look out for flaggers, delays.
Between Good Creek Road (3 miles south of the New Meadows area) and US 95 (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Expect 15 - minute delays. From 7:00AM MDT to 6:00PM MDT daily. Until September 30.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on ID 55
Map of Reports on ID 55 Between I-84 and Franklin Road (Meridian). Road construction work is in progress. The roadway is reduced to one lane. There is work on the shoulder. Look out for flaggers. Expect delays. Speed limit 40 MPH. Expect 10 - minute delays. From 10:00PM MDT to 5:00AM MDT on Sundays, Mondays, Tuesdays, Wednesdays and Thursdays. Until September 4. Between Good Creek Road (3 miles south of the New Meadows area) and US 95 (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Expect 15 - minute delays. From 7:00AM MDT to 6:00PM MDT daily. Until September 30.
ID 55 southbound: Road construction, roadway reduced to one lane, work on the shoulder, look out for flaggers, delays.
ID 55 northbound: Roadway reduced to one lane, disabled semi trailer.
ID 55 in both directions: Bridge construction, roadway reduced to one lane, delays, look out for flaggers, width limit in effect.
ID 55: Road construction, roadway reduced to one lane, look out for flaggers, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info