Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 3
ID 3 in both directions: Bridge construction.
Between ID 5; Third Street and Saint Joe River Road (near St. Maries). Bridge construction work is in progress. Until January 31, 2018 at about 11:59PM PST.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on ID 3
Map of Reports on ID 3 Between ID 5; Third Street and Saint Joe River Road (near St. Maries). Bridge construction work is in progress. Until January 31, 2018 at about 11:59PM PST.
ID 3 in both directions: Bridge construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info