Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15
I-15 in both directions: Roadway reduced to one lane, intermittent lane closure, mobile maintenance operations, work on the shoulder.
Between The Utah State Line (12 miles south of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. A lane is closed intermittently. Look out for mobile maintenance operations. There is work on the shoulder. From 7:00AM MDT to 4:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until September 12.
I-15 in both directions: Roadway reduced to one lane, alternating lane closures, mobile maintenance operations, bridge maintenance operations, work on the shoulder.
Between Exit 3: Woodruff Road (9 miles south of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. There are alternating lane closures. Look out for mobile maintenance operations. Bridge maintenance work is in progress. There is work on the shoulder. From 7:00AM MDT to 4:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until September 12.
I-15 in both directions: Roadway reduced to one lane, alternating lane closures, seal coat, loose gravel, speed restrictions in force, consider using an alternate route.
Between Exit 17: ID 36; State Highway 36 (2 miles north of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. There are alternating lane closures. A seal coat treatment has been applied. Look out for loose gravel on the roadway. Speed restrictions are in force. Consider using an alternate route. Speed limit 70 MPH. Until September 1.
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, speed restrictions in force, width limit in effect.
Between Exit 31: ID 40; Downey Road and Exit 40: Arimo Road (2 to 7 miles south of the Arimo area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 1.
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work in the median, speed restrictions in force, width limit in effect.
Between Exit 93: US 26 and Northbound Blackfoot Rest Area (3 miles north of the Blackfoot area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Width limit 14'0". Speed limit 65 MPH. Until November 1.
I-15 in both directions: Road construction, seal coat, night time construction work, speed restrictions in force, alternating lane closures.
Between Exit 108: River Road and Exit 128: Osgood Road (3 miles south of the Idaho Falls area). Road construction work is in progress. A seal coat treatment has been applied. Night time construction work is in progress. Speed restrictions are in force. There are alternating lane closures. Width limit 14'0". Until August 31.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-15
Map of Reports on I-15 Between The Utah State Line (12 miles south of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. A lane is closed intermittently. Look out for mobile maintenance operations. There is work on the shoulder. From 7:00AM MDT to 4:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until September 12. Between Exit 3: Woodruff Road (9 miles south of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. There are alternating lane closures. Look out for mobile maintenance operations. Bridge maintenance work is in progress. There is work on the shoulder. From 7:00AM MDT to 4:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until September 12. Between Exit 17: ID 36; State Highway 36 (2 miles north of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. There are alternating lane closures. A seal coat treatment has been applied. Look out for loose gravel on the roadway. Speed restrictions are in force. Consider using an alternate route. Speed limit 70 MPH. Until September 1. Between Exit 31: ID 40; Downey Road and Exit 40: Arimo Road (2 to 7 miles south of the Arimo area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 1. Between Exit 93: US 26 and Northbound Blackfoot Rest Area (3 miles north of the Blackfoot area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Width limit 14'0". Speed limit 65 MPH. Until November 1. Between Exit 108: River Road and Exit 128: Osgood Road (3 miles south of the Idaho Falls area). Road construction work is in progress. A seal coat treatment has been applied. Night time construction work is in progress. Speed restrictions are in force. There are alternating lane closures. Width limit 14'0". Until August 31.
I-15 in both directions: Roadway reduced to one lane, intermittent lane closure, mobile maintenance operations, work on the shoulder.
I-15 in both directions: Roadway reduced to one lane, alternating lane closures, mobile maintenance operations, bridge maintenance operations, work on the shoulder.
I-15 in both directions: Roadway reduced to one lane, alternating lane closures, seal coat, loose gravel, speed restrictions in force, consider using an alternate route.
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, speed restrictions in force, width limit in effect.
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work in the median, speed restrictions in force, width limit in effect.
I-15 in both directions: Road construction, seal coat, night time construction work, speed restrictions in force, alternating lane closures.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info