Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 75: Road construction.
ID 75: Road construction.
Between Timber Way and Elkhorn Road; River Ranch Road (2 miles south of the Sun Valley area). Road construction work is in progress. The roadway is reduced to two lanes. Observe speed limits. Expect delays. Look out for flaggers. There is a width limit in effect. Drive with extreme caution. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 16'0". Until today at about 5:00PM MDT.

Comment: Construction of Idaho 75 between East Fork Road and the Big Wood River Bridge (milepost 122-127). Contractor: Idaho Sand and Gravel 208-324-5100
Last updated on September 16