Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
I-84: Road construction.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 12'0". Until October 1, 2015.

Comment: I-84 Loads over 12’ wide (westbound) are being detoured between exits 57 and 59 via Federal Way. I-84 loads over 12’ wide (eastbound) are being detoured off and on at the Gowen Road IC Ramps. This restriction will be in place until late October 2014.
Last updated yesterday at 3:49pm MDT
See Boise area traffic map
I-84: Road construction.
Map of I-84: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info