Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Ended Event:
I-84: Road construction.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. Until today at about 11:59PM MDT.

Web Comment: Traffic on Gowen Road will be shifted tonight (Sept. 21) between Federal Way and the I-84 eastbound ramps. The new traffic pattern will result in two significant changes: • Lane restrictions will require drivers turning right from Gowen Road onto Federal Way, heading towards Micron, to get in the turn lane early. The lane restrictions will be in place through Saturday morning (Sept. 26). • Drivers will only be able to turn right from the I-84 westbound off-ramp onto Gowen Road. No left-turns will be permitted through November as crews install a new traffic signal at this intersection. o Drivers who need to access Gowen Road west of the interchange should use the Eisenman exit. ITD anticipates the signal at Gowen Road and the I-84 westbound ramps will be activated by the end of November.
Last updated yesterday at 4:11pm MDT
See Boise area traffic map
I-84: Road construction.
Map of I-84: Road construction.
Zoom In
Zoom Out
Expired: (I-84: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force.)
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info