Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84 in both directions: Road construction, paving operations, roadway reduced to one lane, alternating lane closures, speed restrictions in force, width limit in effect.
I-84 in both directions: Road construction.
Between Exit 245: 1400S Road and Exit 254: Sweetzer Road (34 to 42 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until Friday, at about 7:00PM MDT.

Comment: Roadway paving between Sublett Interchange (Exit 245) and Sweetzer Road interchange (Exit 254). Use caution through construction zone. Contractor: Knife River, 208-362-6152
Last updated yesterday at 8:03am MDT
I-84 in both directions: Road construction.
Map of I-84 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info