Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15 in both directions: Roadway reduced to one lane, bridge construction, work on the shoulder, work in the median, speed restrictions in force, width limit in effect, consider using an alternate route, drive with extreme caution.
I-15 in both directions: Roadway reduced to one lane.
Between Exit 63: Portneuf Road and Exit 71: Interstate 15 Business (Pocatello). Roadway reduced to one lane. Bridge construction. Work on the shoulder. Work in the median. Speed restrictions in force. Width limit in effect. Consider using an alternate route. Drive with extreme caution. Speed limit 55 MPH. Width limit 12'0". From 7:00AM MDT to 6:00PM MDT on weekdays. Starting August 23, 2017 at 7:00AM MDT until August 31, 2017 at about 6:00PM MDT.

Web Comment: This bridge repair project is on I-15, between milepost 65, South 5th Avenue Exit, and Exit 69, Clark Street, in Pocatello. Two-way, single lane traffic control in both directions. Lane closures in effect 24 hours a day, 7 days a week. Use extreme caution on entrance and exit ramps.
Last updated yesterday at 7:55pm MDT
Starting August 23, 2017 at 7:00AM MDT
Map of Starting August 23, 2017 at 7:00AM MDT
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info