Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84 in both directions: Road construction, roadway reduced to two lanes, paving operations, ramp restrictions in force, speed restrictions in force, width limit in effect.
I-84 in both directions: Road construction.
Between I-84 (2 miles west of the Hazelton area) and Exit 201: ID 25; Kasota Road (4 miles east of the Hazelton area). Road construction work is in progress. The roadway is reduced to two lanes. The road is being repaved. Ramp restrictions are in force. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until today at about 12:00PM MST.

Web Comment: I-84 reconstruction and bridge rehabilitation work of eastbound lanes. All traffic in westbound lanes between milepost 181 to 194. Alternating ramp closures for eastbound traffic through construction zone, watch message signs through project area for current closures. Contractor: Knife River Inc., 208-362-6152
Last updated yesterday at 4:09pm MST
I-84 in both directions: Road construction.
Map of I-84 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info