Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15: Paving operations, alternating lane closures, speed restrictions in force, width limit in effect.
I-15: Paving operations.
Between Exit 180: Spenser Road (Spencer) and The Montana State Line (11 miles north of the Spencer area). The road is being repaved. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Width limit 12'0". Until October 6, 2017 at about 11:59PM MDT.

Web Comment: Width limits is 12 feet when paving driving lane, wide loads call 208-705-6636 for scheduling. Speed reduced to 45 through 4 mile active work zone.
Last updated on August 29
I-15: Paving operations.
Map of I-15: Paving operations.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info