Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84 in both directions: Bridge construction, roadway reduced to two lanes, width limit in effect, speed restrictions in force.
I-84 in both directions: Bridge construction.
Between Exit 211: US 30; ID 24 and Exit 216: ID 25; ID 77 (5 miles east of the Heyburn area). Bridge construction work is in progress. The roadway is reduced to two lanes. There is a width limit in effect. Speed restrictions are in force. Speed limit 65 MPH. Width limit 14'0". Until October 27, 2017 at about 5:00PM MDT.

Web Comment: Bridge construction over Snake River at milepost 216. Use caution at on and off ramps at Declo Interchange (Exit 216).
Last updated on September 22
I-84 in both directions: Bridge construction.
Map of I-84 in both directions: Bridge construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info