Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84 - Critical Reports
I-84: Flash Flood Warning.
Between Exit 71: Mayfield Road (13 miles east of the Boise area) and The Bliss Rest Area - Elmore County Line (6 miles west of the Bliss area). A Flash Flood Warning is in effect. Until today at about 9:15PM MDT.
Show all Road Reports on I-84
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on I-84
Map of Reports on I-84 Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until October 31. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Speed restrictions are in force. Speed limit 55 MPH. Width limit 10'0". Until October 3. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 18'0". Until October 3. Between Exit 38: I-84B (Meridian) and I-184 (Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to two lanes. The left lane is closed. Speed restrictions are in force. Speed limit 55 MPH. Until October 31, 2015. Between ID 55 (Meridian) and Exit 50: Overland Road (Boise). Traffic is stop and go. Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH. Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. Until October 1, 2015. Between The Boise Port of Entry and Exit 74: Simco Road (8 to 12 miles east of the Boise area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 16'0". Until August 15. Between Exit 71: Mayfield Road (13 miles east of the Boise area) and The Bliss Rest Area - Elmore County Line (6 miles west of the Bliss area). A Flash Flood Warning is in effect. Until today at about 9:15PM MDT. Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until August 29.
I-84: Flash Flood Warning.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info