Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95 - Critical Reports
Show all Road Reports on US 95
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on US 95
Map of Reports on US 95 Between Jackson Creek Road and Whitleley Avenue (near Council). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. A detour is in operation. From 7:00AM MDT to 7:00PM MDT on weekdays. Until May 18, 2017. Between 45th Parallel Road (3 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Look out for mobile maintenance operations. Expect delays. Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31. Between Hangman Creek Road (1 mile north of the Tensed area) and Minaloosa Valley Road (5 miles south of the Plummer area). There is work on the shoulder. Short delays are possible. Until today at about 1:00PM PDT. Between A Street (1 mile north of the Plummer area) and First Street (near Worley). The road is being repaved. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Speed limit 45 MPH. Until September 21. Between Lakeshore Drive (1 mile south of the Sandpoint area) and Sandcreek Bypass Bridge (Sandpoint). Road construction work is in progress. The road is being repaved. Be aware of narrow lanes. There is a width limit in effect. The roadway is reduced to one lane. Width limit 12'0". Speed limit 35 MPH. Until August 3.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info