Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95 - Critical Reports
Show all Road Reports on US 95
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on US 95
Map of Reports on US 95 Between Thomason Lane (9 miles north of the Cambridge area) and Colt Street (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. A pilot car is in operation. Expect 15 - minute delays. From 7:00AM MDT to 6:00PM MDT daily. Until September 30. Between 45th Parallel Road and Smokey Boulder Road (2 to 5 miles north of the New Meadows area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. From 10:00AM MDT to 4:00PM MDT on Wednesday and Thursday. Until tomorrow at about 4:00PM MDT. Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. Until Friday, at about 7:00PM PDT. Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. Look out for loose gravel on the roadway. Until Friday, at about 7:00PM PDT. Between Johnston Road and Seltice Avenue (near Plummer). Bridge construction work is in progress. Speed limit 20 MPH. Width limit 14'0". Until Friday, at about 7:00PM PDT. Between Bunco Road - Brunner Road (near Athol) and Old House Road (2 miles north of the Athol area). Major road construction work is in progress. The roadway is reduced to one lane because of a new road layout. Expect changing traffic patterns. On bridges. Reduce your speed. Look out for flaggers. Until September 30.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info