Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15 - Critical Reports
Show all Road Reports on I-15
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on I-15
Map of Reports on I-15 Between The Utah State Line (12 miles south of the Malad City area) and Exit 31: ID 40; Downey Road (10 miles south of the Arimo area). Look out for mobile maintenance operations. There is work on the shoulder. People are working in the median. From 7:00AM MDT to 4:30PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until Thursday, at about 4:30PM MDT. Between The Cherry Creek Rest Area (3 miles south of the Malad City area) and Exit 22: Colton Lane (2 miles north of the Malad City area). Look out for mobile maintenance operations. The roadway is reduced to one lane. There are alternating lane closures. If weather permits. Until July 8. Between Exit 31: ID 40; Downey Road and Exit 40: Arimo Road (2 to 7 miles south of the Arimo area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Width limit 14'0". Speed limit 65 MPH. Until November 1. Between The Inkom Port of Entry and Exit 57: Interstate 15 Business (near Inkom). Road maintenance work is in progress. The roadway is reduced to one lane. The left lane is closed. Look out for flaggers. Until tomorrow at about 5:00PM MDT. Between Exit 57: Interstate 15 Business (Inkom) and Exit 63: Portneuf Road (2 miles north of the Inkom area). The roadway is reduced to one lane. There are alternating lane closures. Road construction work is in progress. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 70 MPH. Width limit 12'0". From 7:00AM MDT to 5:30PM MDT on weekdays. Until August 2. Between Exit 71: Interstate 15 Business (Pocatello) and Exit 80: Fort Hall (near Chubbuck). Road maintenance work is in progress. The roadway is reduced to one lane. Until today at about 7:00PM MDT. Between Exit 93: US 26 and The Blackfoot Rest Area (3 miles north of the Blackfoot area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Width limit 14'0". Speed limit 65 MPH. Until November 1. Between The Blackfoot Rest Area and Exit 113: US 26; Interstate 15 Business (4 to 9 miles south of the Idaho Falls area). The roadway is reduced to one lane. Bridge maintenance work is in progress. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". From 7:00AM MDT to 5:30PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until July 31.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info